Skip to content
Top View Electric

Industrial Overhead Cranes & Hoists

When an overhead crane stops, material stops moving and the work around it waits. The power bars and the hoist controls are where we start.

Draft copy, to be confirmed

Scope of Work

  1. Bridge Crane Power Bars

    Installing and replacing the conductor bars that deliver power along the crane's runway.

  2. Hoist Controls

    Installing, repairing and troubleshooting the control systems that operate hoists.

  3. Annual ESA Compliance Inspections

    Annual electrical inspections of overhead cranes and hoists to support ESA compliance.

Include With Your Inquiry

  • Site address and access
  • Crane make, model and supply requirements
  • Site power plan or utility contact
  • Erection and dismantle dates

Crane Going Up?

Send the crane model and the erection date. We will take it from there.

24/7 Emergency Dispatch

For urgent faults, outages and equipment down on site, call our dispatch line.