Skip to content
Top View Electric

Grid-Tie & Substation Upgrades

New load or new generation usually means the service has to grow first. Switchboard heavy-ups and utility protection are the work between the site and the utility.

Draft copy, to be confirmed

Scope of Work

  1. Switchboard Heavy-Ups

    Upgrading switchboards from 400A to 4000A+ to support increased capacity.

  2. Utility Protection Panels

    Installing the protection panels used at the connection between a site and the utility.

Include With Your Inquiry

  • Single-line diagram
  • Capacity and voltage
  • Utility connection requirements or studies
  • Project milestones

Send the Single-Line

It is the fastest way for us to scope an interconnect.

24/7 Emergency Dispatch

For urgent faults, outages and equipment down on site, call our dispatch line.