
Grid-Tie & Substation Upgrades
New load or new generation usually means the service has to grow first. Switchboard heavy-ups and utility protection are the work between the site and the utility.
Draft copy, to be confirmed
Scope of Work
Switchboard Heavy-Ups
Upgrading switchboards from 400A to 4000A+ to support increased capacity.
Utility Protection Panels
Installing the protection panels used at the connection between a site and the utility.
Include With Your Inquiry
- Single-line diagram
- Capacity and voltage
- Utility connection requirements or studies
- Project milestones
24/7 Emergency Dispatch
For urgent faults, outages and equipment down on site, call our dispatch line.